Process of construction

Process of construction

I) The contract signing process

1) Construction quotation

A Dong Feng Feng Shui Company has two forms of quotation:

1. Quotation according to construction area (calculated according to construction coefficient)
2. Quotations according to volume estimates (according to technical design dossiers)


Values ​​according to quotations are equal to the construction area calculated on the Construction Permits or preliminary drawings approved by the two parties.

The value in Asia's price does not include 10% VAT.


2) Construction contract

Construction contract is a form stipulated by the company, the lawyer's office based on the interests and responsibilities of the parties, customers please do not modify the content (except the clause on items made more).

You should read and calculate carefully before signing the contract, to preview the sample contract, please contact by email: phongthuyxaydungadong@gmail.com

After agreeing the price and method of construction, the two sides will sign the construction contract for implementation. The contract value may increase or decrease depending on the area of ​​production or when the volume changes, the unit price does not change during the implementation of the contract.

Where the aim is to keep the price and arrange the construction team, the customer and the company can sign the construction contract (not more than 3 months). Customers will have to advance the amount of 20% of the total value of the contract at the time of signing to order materials and design work (for customers who do not have design drawings). The contract value will not change until the work is completed.

A Dong Feng Feng Shui Construction Co., Ltd provides complete package including Construction Permit / Notification of Inception / Organization of Supervisor / Supervisor Organization ... In addition, A Dong is responsible for purchasing accident insurance work / insurance for third parties ...
 

 

II) Process of executing a specific project

1) Preparation phase

 

  • Announce the construction work to the local authorities in writing, inform the neighboring households, taking pictures of the status of adjacent works.
  • Signboard of the project (including 4 tables as prescribed: signboards, construction rules, labor safety, warnings of works)
  • Preparation of ground, borrowing pavement, preparation of electricity sources, water sources for construction
  • Installation of gates / fences according to company standards
  • To prepare construction design dossiers as a technical basis for construction
  • Position the work, determine the standard altitude.
  • Preparation of labor / preparation of raw materials supply process

 

2) Construction stage and foundation works

Digging of foundation pit / pouring concrete foundation


Installation of foundation / reinforced concrete / foundation pouring, anchoring moment, brace


Excavation of soil, composting pits, manholes, basins with sound tanks of card brick


3) Construction phase:


Installation of steel columns / Column construction / Column concrete

Wall covering / Shielding works by technique

Installation of beam formwork / Installation of reinforced beam, floor.

Installation of technical piping system to the floor.

Concrete beams, floors.

Build walls, stairs

Installation of electricity, water wall

Ceiling, plastered walls, outside walls

Waterproofing floor tiles and open floor

4) Finishing works

Ceiling paint, interior and exterior walls, door paint

Paving, paving, stone decoration ...

Installation of electrical equipment, water, lighting

Wood furniture installation (if any)

Work sanitation, complete repair
 

III) Warranty / Maintenance Process
1) Technical Warranty


The warranty period is 3 years from the completion of the work.

During the warranty period, if there is a problem of technical failure (not warranty materials), please notify by phone or contact directly to the company. Within 48 hours the company will send people to survey at the site, identify the cause and have a repair plan.

A Dong Feng Feng Shui Construction Company organizes construction, self-supplying materials in the raw materials, organizes technical supervision, ensures labor safety for all items of the works, pledges not sell bid.